| 1. |
Before
installation of a STREAMLINER M, the
lubrication point (bearing and passage) should be
manually lubricated using a grease gun to ensure that
the bearing has a clear passage. It is recommended that
this procedure be conducted using either the same or a
compatible lubricant with what is contained in the
grease pouch of the STREAMLINER M. |
|
|
| 2. |
If
any doubts exist in regards to a clear lubrication flow,
test the backpressure of the bearing with a grease gun
connected to a pressure gauge. Ensure that the break –
off pressure is below 500 psi (approx. 35
kg-f/cm2: 34.5 bar). Note that it is always
desirable to keep the constant delivery pressure as low
as possible.
|
|
|
| 3. |
Remove
the transparent top housing of the M unit by turning it
counter clockwise. Insert the Battery Pack into the
battery compartment of the main unit. (Make sure that
the battery is locked in place after insertion by
turning the metal clip on top). Take cap off of Grease
Pouch.. Place the open end of the grease pouch over the
outlet of the pump suction inlet on the M unit and screw
the grease pouch in. (Note: Do not screw on too
tightly.) Place the transparent top housing on the M
unit and turn clockwise until
you hear the top housing make a
“click”.
|
|
|
| 4. |
| Turn
the STREAMLINER M unit ON by
depressing the Power button for 2 seconds.
Confirm that the LCD is turned on, by checking
that the Red LED blinks once. As long as the LCD
is displayed, the unit is working. To test that
the unit is operational, simply follow the FUNCTION TEST MODE procedure: |
| |
-
Depress POWER button first and then depress the
125/250cc TEST button for 2 seconds. The unit
will start and begin discharging grease. The
unit will operate continuously in Purge mode and
go through an entire cycle (Approximately 2
min).
-
To
deactivate the FUNCTION TEST MODE, press the
TEST button again. The unit will stop testing
within the next 20 seconds.
-
If
the unit is malfunctioning or if you encounter
any difficulty, please refer to the
troubleshooting guide.
|
|
| 5. |
Depress MODE button to set dispensing rate. Each time the MODE button is depressed, the dispensing
rate changes in ascending order i.e. 1► 2► 3► 6►12►
H. note (H = Half month.)
|
|
|
| 6. |
Remove
the grease nipple used for backpressure testing, and
install an appropriate adaptor of 3/8” NPT or BSP and
make sure that the unit is well tightened to it. The
3/8” brass thread of the unit is vibration proof. In
other words it ensures that that fitting will not snap
off at the nose even under severe vibration or shock
load.
|
|
|
| 7. |
For
installations that involve extreme vibration, excessive
heat, or service location that is considered dangerous,
use the remote mounting bracket (clamping device) and ¼”
hose no longer than 10ft. that we have
available.
|
|
|
|
IMPORTANT : Be sure to pre-fill the ¼” hose, prior to
installation. Remote installation of over 10ft will
reduce the ability of the unit to dispense against
elevated backpressure.
|