Operating Principles

 

Features

Specification
 

Dispensing Recommendation

Application
 

Grease Selection Guideline

Troubleshooting Guideline
 

First Installation

Precaution

   

 

 

 

First Installation
1. Before installation of a STREAMLINER M, the lubrication point (bearing and passage) should be manually lubricated using a grease gun to ensure that the bearing has a clear passage. It is recommended that this procedure be conducted using either the same or a compatible lubricant with what is contained in the grease pouch of the STREAMLINER M.
 
2. If any doubts exist in regards to a clear lubrication flow, test the backpressure of the bearing with a grease gun connected to a pressure gauge. Ensure that the break – off pressure is below 500 psi (approx. 35 kg-f/cm2: 34.5 bar). Note that it is always desirable to keep the constant delivery pressure as low as possible.
 
3. Remove the transparent top housing of the M unit by turning it counter clockwise. Insert the Battery Pack into the battery compartment of the main unit. (Make sure that the battery is locked in place after insertion by turning the metal clip on top). Take cap off of Grease Pouch.. Place the open end of the grease pouch over the outlet of the pump suction inlet on the M unit and screw the grease pouch in. (Note: Do not screw on too tightly.) Place the transparent top housing on the M unit and turn clockwise until you hear the top housing make a “click”.
 
4.
Turn the STREAMLINER M unit ON by depressing the Power button for 2 seconds. Confirm that the LCD is turned on, by checking that the Red LED blinks once. As long as the LCD is displayed, the unit is working. To test that the unit is operational, simply follow the FUNCTION TEST MODE procedure:
 
  • Depress POWER button first and then depress the 125/250cc TEST button for 2 seconds. The unit will start and begin discharging grease. The unit will operate continuously in Purge mode and go through an entire cycle (Approximately 2 min).

  • To deactivate the FUNCTION TEST MODE, press the TEST button again. The unit will stop testing within the next 20 seconds.

  •  If the unit is malfunctioning or if you encounter any difficulty, please refer to the troubleshooting guide.

5. Depress MODE button to set dispensing rate. Each time the MODE button is depressed, the dispensing rate changes in ascending order i.e. 1► 2► 3► 6►12► H. note (H = Half month.)
 
6. Remove the grease nipple used for backpressure testing, and install an appropriate adaptor of 3/8” NPT or BSP and make sure that the unit is well tightened to it. The 3/8” brass thread of the unit is vibration proof. In other words it ensures that that fitting will not snap off at the nose even under severe vibration or shock load.
 
7. For installations that involve extreme vibration, excessive heat, or service location that is considered dangerous, use the remote mounting bracket (clamping device) and ¼” hose no longer than 10ft. that we have available.
 
IMPORTANT    :  Be sure to pre-fill the ¼” hose, prior to installation. Remote installation of over 10ft will reduce the ability of the unit to dispense against elevated backpressure.